Charlotte Winter Progress Day Three

I managed to squeeze in a third day’s worth of knitting over my Christmas vacation. On Day three I managed to finish the raglan, separate for sleeves and start the body with A-line shaping.

Given my post baby #2 enhanced waste line I opted for an a-line shape to provide better coverage for the back 40. I think at this point I have used two full balls of the grey yarn and starting the third. I have six total. And I haven’t slipped this one to check fit either.

Here is a gratuitous shot of car knitting in my new favorite pajama leggings. It was a bright and cold trip home from Christmas with snoozing dogs and babies in the back. A pretty darn good trip except for the PB had a blow out in her car seat in the last 5 min of the drive. I think she just wanted to give me a belated Christmas present, lol.

Happy Knitting!

Advertisements

8 thoughts on “Charlotte Winter Progress Day Three

  1. Pingback: Checking Fit | My Tangled Yarn Knitting Adventures

  2. Pingback: WIP Wednesday: Charlotte Winter | My Tangled Yarn Knitting Adventures

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s