Checking Fit

After three days of some pretty monogamous sweater knitting I have a good jump on my Charlotte Winter. I thought it would be a great idea to check the fit before I got too much farther.

I really think it’s not too bad! I mean the bottom is still bunched up on needles. But the yoke fits nicely and there is not too much ease in the armpits that I can tell so far. And it should button nicely.

Not to mention the color work turned out pretty spiffy! I think I may pause on the body and work the sleeves to maximize yarn usage. I don’t think I’m going to run out but I may want to lengthen the body if I have enough yarn. Plus turning the sleeves might be easier without a fully body of bulky sweater weighing me down.

I’m torn between working on this sweater and finishing PB’s sweater. Both are kind of ready for sleeve island. It’s kind of a toss up, lol.

Happy Knitting!!

Advertisements

Charlotte Winter Progress Day Three

I managed to squeeze in a third day’s worth of knitting over my Christmas vacation. On Day three I managed to finish the raglan, separate for sleeves and start the body with A-line shaping.

Given my post baby #2 enhanced waste line I opted for an a-line shape to provide better coverage for the back 40. I think at this point I have used two full balls of the grey yarn and starting the third. I have six total. And I haven’t slipped this one to check fit either.

Here is a gratuitous shot of car knitting in my new favorite pajama leggings. It was a bright and cold trip home from Christmas with snoozing dogs and babies in the back. A pretty darn good trip except for the PB had a blow out in her car seat in the last 5 min of the drive. I think she just wanted to give me a belated Christmas present, lol.

Happy Knitting!

Charlotte Winter Sweater Progress Day Two

My Charlotte Winter was my Christmas vacation progress. I seized the opportunity of grandparent and auntie baby sitting time to see how far I could knit on a bulky sweater project.

Here is my Day Two progress:

img_7847

I managed to complete all the garter ridge stripes and I’m finishing the raglan increases. It’s getting to be a lot of stitches on the needles at this point.  But man it was nice to have some soothing garter stitches to watch my kids play and catch up on some Christmas movies.

I did take some time here to bury some of the ends for the color changes in the yoke. I didn’t trim them because I want to block them first. But it really helped to make this project less messy and more manageable. I have one more day’s worth of progress to show you before I had to go back to real life.

Happy Knitting!!